Easter Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

VCE 210-010 Exam With Confidence Using Practice Dumps

Exam Code:
210-010
Exam Name:
VCE Vblock Systems Deployment and Implementation - Core Exam
Vendor:
Questions:
128
Last Updated:
Apr 20, 2025
Exam Status:
Stable
VCE 210-010

210-010: VCE Certified Professional Program Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the VCE 210-010 (VCE Vblock Systems Deployment and Implementation - Core Exam) exam? Download the most recent VCE 210-010 braindumps with answers that are 100% real. After downloading the VCE 210-010 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the VCE 210-010 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the VCE 210-010 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (VCE Vblock Systems Deployment and Implementation - Core Exam) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 210-010 test is available at CertsTopics. Before purchasing it, you can also see the VCE 210-010 practice exam demo.

Related VCE Exams

VCE Vblock Systems Deployment and Implementation - Core Exam Questions and Answers

Question 1

Which network capability does the Cisco Nexus 1000V provide in a Vblock System 720?

Options:

A.

vNic drivers

B.

IP address assignment

C.

distributed switching

D.

routing

Buy Now
Question 2

When powering on a Vblock System what is the correct power up sequence?

Options:

A.

Switches, AMP, SAN, UCS chassis, and UCS blades

B.

Switches, SAN, UCS chassis, UCS blades, and AMP

C.

Switches, AMP, UCS chassis, UCS blades, and SAN

D.

Switches, SAN, AMP, UCS chassis, and UCS blades

Question 3

What are two expected results of the VMware vMotion test plan conducted by VCE at the completion of a Vblock System build? (Choose two.)

Options:

A.

No unexpected errors or faults occur.

B.

The secondary VSM takes over from the primary VSM.

C.

There will be minimal packet loss during vMotion.

D.

Traffic fails over to the redundant port channel each time a port-channel is disabled.