Easter Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Free and Premium SAP E_S4HCON2023 Dumps Questions Answers

SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Question 1

You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

Options:

A.

Apply the corresponding SAP note via SAP Note Assistant

B.

Generate it by analyzing the specific custom code via RFC

C.

Configure it within transaction ATC

D.

Download it from SAP Support Portal

Buy Now
Question 2

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

Options:

A.

To optimize the migration

B.

To optimize the activation

C.

To optimize the conversion

D.

To optimize the main import

Question 3

What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?

Please choose the correct answer.

Response:

Options:

A.

An upgrade of the software components is performed, without changing the database type.

B.

A change of the database type is performed, without changing the software components.

C.

An SAP S/4HANA conversion is performed, without adapting the customer data.

D.

A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Question 4

What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

Options:

A.

You can verify that the content of the download directory matches the stack XML file.

B.

You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs

C.

You can record the modification adjustment during migration and use the transports in the next runs.

D.

You can find the optimal number of parallel H3load processes by monitoring host performance

Question 5

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

Options:

A.

PARMVNT_UPG

B.

TABIMJJPG

C.

PARDIST_SHD

D.

TABIM_SHADOW_*

Question 6

Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

Options:

A.

Unicode conversion

B.

Custom code analysis

C.

Database migration

D.

Software update

Question 7

You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?

There are 2 correct answers to this question.

Response:

Options:

A.

Conversion of application tables (PARCONV_UPG)

B.

Activation of dictionary objects (ACT_UPG)

C.

Switch to new repository (EU_SWITCH)

D.

Modification adjustment (SPDD)

Question 8

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

Options:

A.

SAP S/4HANA conversion including DMO

B.

Prerequisite check

C.

DMO without system update

D.

SAP S/4HANA conversion without DMO

E.

Benchmark tool

Question 9

You are planning an SAP S/4HANA conversion.

Which conversion-specific tasks must be performed during the preparation phase?

Options:

A.

Check the compatibility of custom code with SAP S/4HANA.

B.

Run the database migration to the SAP HANA database.

C.

Solve problems from the simplification item (SI) checks.

D.

Perform the migration of data to the new data structure.

Question 10

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

Options:

A.

After SUM has ended

B.

During the Execution roadmap step

C.

Before the start of the SUM technical downtime

D.

During the SUM technical downtime

Question 11

You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.

What does the "Calculated level" indicate for those software components?

Please choose the correct answer.

Response:

Options:

A.

The SAP Support Packages that will be bound to the upgrade

B.

The SAP Support Packages contained in the upgrade media

C.

The SAP Support Packages found in the download directory

D.

The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

Question 12

Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

Options:

A.

Shadow on target creation

B.

Downtime conversion

C.

Silent data migration (SDM)

D.

Downtime migration

Question 13

During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?

There are 2 correct answers to this question.

Response:

Options:

A.

Check for running batch jobs in the shadow system via Job Overview (SM37)

B.

Check for running R3trans processes on the host of the primary application server

C.

Check for running R31oad processes on the host of the primary application server

D.

Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Question 14

What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?

There are 3 correct answers to this question.

Response:

Options:

A.

Phases DIFF*

B.

Phase DOWNCONF_DTTRANS

C.

Phase RUN_RSPTBFIL _ISUTABU

D.

Phases EU_IMPORT*

E.

Phase RUN_RSDBSCPY

Question 15

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.

The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

Please choose the correct answer.

Response:

Options:

A.

There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

B.

SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

C.

The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.

D.

These are 40 pairs of R3load processes, so there are 80 R3load processes running.

Question 16

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?

There are 2 correct answers to this question.

Response:

Options:

A.

Run the database migration to the SAP HANA database

B.

Perform the migration of data into the new data structure

C.

Check the compatibility of custom code with SAP S/4HANA

D.

Apply the recommendations of the simplification list

Question 17

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?

Please choose the correct answer.

Response:

Options:

A.

Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

B.

Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

C.

Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

D.

Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Question 18

You want to execute a Unicode Conversion only. Which approach do you need to follow?

Please choose the correct answer.

Response:

Options:

A.

SWPM using the Backup / Restore procedure

B.

SUM with DMO

C.

SUM without DMO

D.

SWPM using the Load procedure

Question 19

You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?

Please choose the correct answer.

Options:

A.

Credentials of a named user in client 000 of the shadow system

B.

Credentials of a named user in the development client of the development system

C.

Credentials of user DDIC in client 000 of the shadow system

D.

Credentials of user DDIC in the development client of the development system

Question 20

You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

Options:

A.

The start of the Execution roadmap step

B.

The start of the business downtime

C.

The end of the business downtime

D.

The end of the database migration

Question 21

Which are valid options to check the progress of the database migration in a Microsoft Windows environment?

There is correct answers to this question.

Response:

Options:

A.

Check the "Charts Control Center" in the SUM UI

B.

Check logs for jobs starting with "RSUPG_SGEN" in the system

C.

Check the log files written under "SUM\abap\log"

D.

Check the dump size of the database export on disk

Question 22

The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?

There are 2 correct answers to this question.

Response:

Options:

A.

Check the most recent entries shown in file sapevt.trc

B.

Check the system log (transaction SM21) of the SAP system

C.

Check the messages shown by the SUM UI

D.

Check the most recent entries in SAPup.log

Question 23

What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

Options:

A.

It explains the database migration option (DMO) of SUM.

B.

It contains a section about the simplification item (SI) checks.

C.

It explains where to find information about the custom code analysis.

D.

It is a database-specific document.

Question 24

What do you need to know about the SAP ERP Upgrade and Update Guide?

There are 2 correct answers to this question.

Response:

Options:

A.

It contains a troubleshooting section

B.

It is target release specific

C.

It contains a section "free space requirements"

D.

It is a database-specific document