Question 1

What values flow from Sales and Distribution billing to costing-based Profitability Analysis?

Note: There are 2 correct answers to this question.

Options:

A.

Value of conditions of the pricing procedure

B.

Value of "Gross Margin 2"

C.

Cost of goods sold split by cost components

D.

Production variances split by variance categories

Buy Now
Question 2

You create a new cost estimate. Which of the following steps are required to update the standard price of the material?

Note: There are 3 correct answers to this question.

Options:

A.

Activate the cost estimate.

B.

Release the cost estimate.

C.

Run the cost estimate.

D.

Mark the cost estimate.

E.

Simulate the cost estimate.

Question 3

You are creating a new activity type and want to maintain plan prices for a cost center. Which attributes must you configure in the activity type master record?

Note: There are 3 correct answers to this question.

Options:

A.

Output quantity

B.

CO version

C.

Valid cost center categories

D.

Activity type category

E.

Price indicator

Question 4

You want to use a template to consider overhead during product costing. How do you assign the template to your material?

Options:

A.

Using a costing key and an overhead key

B.

Using an overhead group and an overhead key

C.

Using an origin group and an overhead group

D.

Using a cost component group and an overhead group

Question 5

How can you populate local variables in Profitability Analysis reports?

Options:

A.

By populating from user parameters

B.

By maintaining the configuration

C.

By defining derivation rules

D.

By user entry during report execution

Question 6

Which of the following objects can be selected in templates for activity-based costing?

Note: There are 2 correct answers to this question.

Options:

A.

Business process

B.

WBS element

C.

Cost center/activity type

D.

Internal order

Question 7

What are some of the unique attributes of an assessment cycle in Controlling?

Note: There are 3 correct answers to this question.

Options:

A.

They use the original cost element during transfer.

B.

They use a secondary cost element during transfer.

C.

They can be processed in an iterative way.

D.

They transfer primary and secondary costs.

E.

They can be defined with an allocation structure.

Question 8

For which objects can you enter statistical key figures?

Note: There are 3 correct answers to this question.

Options:

A.

Functional areas

B.

Cost elements

C.

WBS elements

D.

Cost centers

E.

Internal orders

Question 9

Which type(s) of Profitability Analysis update(s) the cost of goods sold at the time of delivery only?

Options:

A.

Margin analysis

B.

Combined profitability analysis

C.

Costing-based

D.

Both margin analysis and costing-based

Question 10

You are implementing SAP S/4HANA, and you want to run analytical reports off a single data model. How is data reported on in SAP S/4HANA?

Options:

A.

Reporting on data is available in near real-time for aggregated tables.

B.

Reporting on data is available in real-time at every level of detail.

C.

Reporting on data is available in real-time if in conjunction with SAP BW/4HANA.

D.

Reporting on data is available in real-time only for aggregated level of detail.

Question 11

To which object do you assign a costing sheet?

Options:

A.

Cost component structure

B.

Valuation variant

C.

Costing type

D.

Costing variant

Question 12

What do you need to set up in order to bring the values from incoming sales orders into account-basedProfitability Analysis?

Options:

A.

An extension ledger of type "P: Line items with technical numbers / no deletion possible"

B.

A multi-valuation ledger

C.

A new standard G/L ledger with exclusive usage for "Prediction"

D.

An extension ledger of type "S: Line items with technical numbers / deletion possible"

Question 13

Which model can be used for ABAP cloud-native development?

Options:

A.

BAP RESTful Application Programming Model

B.

The SAP S/4HANA Cloud Extensibility Model

C.

The ABAP Cloud Development Model

Question 14

At which level do you define the valuation method for results analysis?

Options:

A.

Valuation area

B.

Operating concern

C.

Client

D.

Controlling area

Question 15

You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?

Options:

A.

Assessment

B.

Periodic reposting

C.

Top down distribution

D.

Distribution

Question 16

Which of the following statements best describe Product Cost by Period?

Note: There are 2 correct answers to this question.

Options:

A.

It is used to analyze costs by individual production lots.

B.

It is used in conjunction with a product cost collector.

C.

It is used when the focus of controlling is on a stable and continuous production process.

D.

It is used to analyze work in process (WIP) based on actual costs.

Question 17

What are some of the objectives of Profitability Analysis?

Note: There are 2 correct answers to this question.

Options:

A.

Provide the company with information on the performance of its market segments.

B.

Provide the company with a detailed view of its financial statements by areas of responsibilities.

C.

Allow the company to determine if the sales force achieved their contribution margin goals.

D.

Allow the company to determine standard costs and revenues according to the period accounting method.

Question 18

You are working in the machinery industry, and you consider implementing cost center budget management. Which functions are available for cost center budget management?

Note: There are 2 correct answers to this question.

Options:

A.

Budget values import with CSV file

B.

Availability control against monthly budget amount

C.

Unused budget carry-forward to next fiscal year

D.

Budget transfer from source cost center to multiple target cost centers

Question 19

In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?

Options:

A.

Source structure

B.

Cost component structure

C.

A transfer structure

D.

Allocation structure

Question 20

How does SAP S/4HANA capture costs?

Note: There are 2 correct answers to this question.

Options:

A.

Only primary costs are captured in general ledger accounts.

B.

Secondary costs are captured in extension ledger CO that references the leading ledger.

C.

Primary and secondary costs are captured on cost elements.

D.

Primary and secondary costs are captured in general ledger accounts.

Question 21

You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?

Options:

A.

Reference variant

B.

Transfer control

C.

Costing type

D.

Costing version

Question 22

You want to enable WIP calculation in Product Cost by Period. What do you need to configure?

Options:

A.

Variance variant

B.

Settlement profile

C.

Profitability Analysis (PA) transfer structure

D.

Valuation variant

Question 23

In the Product Cost by Order process, what does the system calculate depending on the order status?

Options:

A.

WIP at target costs or variances

B.

Both WIP and variances or only variances

C.

WIP at actual costs or variances

D.

WIP at percentage of completion (PoC) method or variances

Question 24

What are some of the characteristics of planning for internal orders?

Note: There are 2 correct answers to this question.

Options:

A.

Availability control can check against plan values.

B.

You can enter costs and revenues.

C.

You can plan multiple versions.

D.

You can define tolerance limits for plan overspend.