You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
For what production type are production orders used?
Which of the following elements does MRP take into account during net requirement calculation?
Why would you use phantom assemblies?
Which of the following is valid sequence of the main activities in production order processing?
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
How can you carry out cost object controlling for production orders?
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?