What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
What must be used in the system to plan the requirements for different subcontractors separately?
You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? There are 2 correct answers to this question.
Where do you maintain the duration of a product on operation?
How can you set up the supply source for the SAP Kanban process? Note: There are 3 correct answers to this question.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.
What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question.
What does it mean for the production planner when MRP works with infinite capacities?
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
What are prerequisites for using batch derivation? There are 2 correct answers to this question.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
Which data object can be updated with the scheduling results of a routing?