New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Free and Premium SAP C_FSUTIL_60 Dumps Questions Answers

Page: 1 / 3
Total 80 questions

SAP Certified Associate - Utilities with SAP ERP 6.0 Questions and Answers

Question 1

What is the main purpose of the reconciliation key?

Options:

A.

To record totals records and pass them to the general ledger

B.

To group summary records and pass them to the general ledger

C.

To enable the processing of invoices and pass them to the general ledger

D.

To group transactions created by one agent and pass them to the general ledger

Buy Now
Question 2

Which blocks can you set on the contract account? (Choose three)

Options:

A.

Central block

B.

Outgoing payments

C.

Dunning

D.

Outsorting

E.

Interest

Question 3

How could you change the billing date for a single customer without adjusting the meter reading unit?

Options:

A.

Change the schedule record.

B.

Change the alternative portion.

C.

Change the portion.

D.

Change the parameter record.

Question 4

Which master data object enables electronic data exchange between market participants?

Options:

A.

Point of delivery

B.

Contract account

C.

Connection object

D.

Supply contract

Question 5

What information is contained in the general ledger items portion of the FI-CA document? (Choose three)

Options:

A.

Posting date

B.

Cost accounting information

C.

Tax data

D.

Receivables G/L account

E.

Net due date

Question 6

Which SAP technical master data object can be influenced by the SAP regional structure?

Options:

A.

Premise

B.

Connection object

C.

Point of delivery

D.

Business partner

Question 7

Dunning procedure A1 is defined with two levels, 01 and 02. Level 01 has a dunning frequency of 1 day and days in arrears of 7. Level 02 has a dunning frequency of 5 days and days in arrears of 17. A customer has an open item due on June 5 and was dunned to level 01 on June 12.

If dunning is executed every day, on which date will level 02 be reached?

Options:

A.

June 29

B.

June 19

C.

June 22

D.

June 13

Question 8

The system should propose data elements when you create technical master data.

Which standard option is available for accomplishing this?

Options:

A.

Include premise type in the political regional structure

B.

Include premise type in the postal regional structure

C.

Include meter reading unit in the political regional structure

D.

Include meter reading unit in the postal regional structure

Question 9

The potential proration of charges that are calculated during billing can be determined based on different criteria, such as a date interval or to the day.

Which of the following indicators do you use to control the way in which the billing period is utilized for charge calculation?

Options:

A.

Event Control

B.

Period Control

C.

MR Control

D.

Variant Control

Question 10

Which optional tasks are supported by configuration in the invoicing process?

Options:

A.

• Interest on cash securities

• Interest on receivables

• Dunning

• Write off

B.

• Post a new receivable

• Account maintenance

• Dunning

• Late payment charges on receivables

C.

• Late payment charges on receivables

• Interest on credits

• Dunning

• Late payment charges on installment plans

D.

• Account maintenance

• Interest on cash securities

• Interest on receivables

• Late payment charges on installment plans

Question 11

You use parallel processing to execute the dunning proposal. A variant for object VKONT is used with interval size 1000 and the number of intervals as 1000.

Which of the following is a result of the batch scheduling process?

Options:

A.

Each interval will generate 1000 dunning activities.

B.

Only one interval has less than 1000 accounts.

C.

All intervals will finish processing at the same time.

D.

All intervals will start processing at the same time.

Question 12

A contract account has multiple services including deregulated electricity, gas, water, and waste water.

The joint invoicing indicators are set on the contracts as follows:

  • Electric Distribution = 1 (must),
  • Electric Supply = 1 (must),
  • Gas = 3 (must not),
  • Water = 2 (can),
  • Waste Water = 2 (can).

How many invoices are produced when you execute the invoice process if billing documents exist for the Electric Distribution, Gas, and Water services?

Options:

A.

3

B.

2

C.

1

D.

0

Page: 1 / 3
Total 80 questions