Question 9

A customer is deploying VCF at a new datacenter location. They will migrate their workloads from the existing datacenter to the new VCF platform over six months. Both datacenters will run simultaneously for six months during the migration. Which of the following should be a documented risk?

Options:

A.

Six months may not be enough time to complete the migration.

B.

There will be connectivity between the two locations.

C.

Bandwidth between the two locations is sufficient to accommodate the workload migration.

D.

Workloads will be powered off during migration.

Question 10

An architect is planning the deployment of Aria components in a VMware Cloud Foundation environment using SDDC Manager and must prepare a logical diagram with networking connections for particular Aria products. Which are two valid Application Virtual Networks for Aria Operations deployment using SDDC Manager? (Choose two.)

Options:

A.

Region-A - Overlay backed segment

B.

Region-A - VLAN backed segment

C.

X-Region - VLAN backed segment

D.

X-Region - Overlay backed segment

Question 11

An architect is designing a VMware Cloud Foundation (VCF)-based private cloud solution for a customer that will include two physical locations. The customer has stated the following requirement:

All management tooling must be resilient at the component level within a single site.

When considering the design decisions for VMware Aria Suite components, what should the Architect document to meet the stated requirement?

Options:

A.

The solution will implement an external load balancer for Aria Operations Cloud Proxies.

B.

The solution will configure the VCF Workload domain in a stretched topology across two locations.

C.

The solution will deploy three Aria Automation appliances in a clustered configuration.

D.

The solution will deploy Aria Suite Lifecycle Manager in a high availability configuration.

Question 12

A customer is implementing a new VMware Cloud Foundation (VCF) instance and has a requirement to deploy Kubernetes-based applications. The customer has no budget for additional licensing. Which VCF feature must be implemented to satisfy the requirement?

Options:

A.

Tanzu Mission Control

B.

VCF Edge

C.

Aria Automation

D.

IaaS control plane