Which schedule can be configured as a synthetic backup in addition to the full backup schedule type?
Which statement applies to a NetBackup calendar based schedule in a Windows policy type?
A NetBackup Master Server has many backups running each night to an MSDP pool that take a long time to complete. While these backups are running, replication jobs are queued.
Which action should the administrator perform to ensure replications can occur without waiting for the backups to complete?
A file system on a server is corrupt and a restore is required. The system is being backed up using True Image Restore with move detection enabled.
The most recent backups of this file system are displayed below.
- Monday: A full backup
- Tuesday: A differential incremental backup
- Wednesday: A cumulative incremental backup
- Thursday: A differential incremental backup
What is the minimum number of backup images that will be used to fully restore the server?