Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Passed Exam Today HH0-220

Page: 3 / 4
Total 109 questions

Hitachi Data Systems Implementation – Modular exam Questions and Answers

Question 9

When performing an initial installation of a Hitachi Unified Storage system, which management tool must be used to set the date and time?

Options:

A.

Web Tool

B.

RAID Manager/CCI

C.

Hitachi Command Suite

D.

Storage Navigator Modular 2

Question 10

A customer would like to add the File Module option to their Hitachi Unified Storage (HUS) system to provide files services. Which three types of connectivity are required from the File Module? (Choose three.)

Options:

A.

FC to HUS

B.

IP to SMU

C.

FC to Servers

D.

IP to Servers

E.

FC to SMU

Question 11

Which two apply when replacing a disk on a Hitachi Unified Storage (HUS) system? (Choose two.)

Options:

A.

A wrist strap must be used when replacing disk drives.

B.

The faulty drive must be blocked using SNM2 before replacement.

C.

The HUS needs to be in maintenance mode when disks are replaced.

D.

The Web tool should be used to confirm that the replacement is successful.

Question 12

You have set Extended Round Robin on a server with intensive sequential I/O profile. Which two benefits result from implementing this algorithm? (Choose two.)

Options:

A.

tracks preloaded to cache

B.

blocks held permanent in Read Cache

C.

no tracks preloading on the system

D.

efficient cache usage on the storage system

Page: 3 / 4
Total 109 questions