Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Nutanix SE Academy NCSE-Core Updated Exam

Page: 6 / 15
Total 198 questions

Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8) Questions and Answers

Question 21

A prospect's business is growing 100% year over year. The prospect is interested in Nutanix for their main datacenter due to the alility to scale quickly and easily. They have three remote sites that will be refreshed within the next year. Each site needs to replicate to their many datacenter. The SE proposes the Nutanix NX line, and the prospect asks to utilize the Xpress line.

For which reason is the Xpress line the wrong choice? (Choose two)

Options:

A.

SX is limited to two 4-node clusters.

B.

SX has a lower services cost for installation.

C.

SX is limited to one 4-node cluster.

D.

SX licensing does not support cluster-to-cluster replication

E.

SX licensing will not support many-to-many- cluster replication

Question 22

Prospective customer explains their current infrastructure and upcoming goals. They are a fast-growing software company with approximately 3000 employees. Engineering accounts for approximately half of total staff and is behind on product releases.

This department has been building their own infrastructure using available hardware, SaaS offerings, and public cloud.

There's a new CIO attempting to gain control of existing and incoming

information systems while supporting the agile environment responsible for their rapid innovation with a minimal staff. From this information, which two addressable pain points or gaps should be discerned?(Choose two)

Options:

A.

System availability issues

B.

SQL Server performance issues

C.

""Shadow IT"" that increases the risk of security breaches and brand damage

D.

Slow response time from the infrastructure group (SLAs) that could result in product release delays

E.

significantly degraded end user experience

Question 23

An SE is working with a financial institution prospect on a VDI environment refresh. The institution currently has 5000 named VDI users, with a peak of 2800 concurrent users.

How many VDI VMs does the SE need to size for, factoring in an additional 10% for growth?

Options:

A.

2880

B.

3080

C.

5000

D.

5500

Question 24

A customer previously purchased a Nutanix solution of nine NX-3060-G7 nodes. The customer asks for help to increase the resiliency of their environment after power outages to individual racks in their datacenter Their current solution consists of two NX-3460-G7 blocks and a single NX-3160-G7 block placed in a single rack. what should the systems engineer recommend to this customer ?

Options:

A.

Buy three additional NX-3060 Upgrade nodes and place them into the NX-3160 block Enable Rack Awareness

B.

Move on node from each NX=3460 block over to the NX-3160 blocks. Enable Block Awareness

C.

Move on node from each NX-3460 into the NX-3160 block. Spread the blocks over three racks and enable Rack Awareness

D.

Buy on additional node and place it, into the NX-3160 block. Spread the blocks over three racks. Enable Rack Awareness.

Page: 6 / 15
Total 198 questions