11.11 Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Implementation Engineer E20-260 Release Date

Page: 3 / 8
Total 210 questions

VPLEX Specialist Exam for Implementation Engineers Questions and Answers

Question 9

Which VPLEX management interface is used for initial configuration?

Options:

A.

eth3

B.

eth2

C.

eth0

D.

eth1

Question 10

What three elements are part of the VPLEX Storage View?

Options:

A.

VPLEX FE Port

Top-Level Device

Host IP address

B.

VPLEX FE Port

Initiator Port

Virtual Volume

C.

VPLEX BE Port

VPLEX FE Port

Virtual Volume

D.

VPLEX BE Port

Initiator Port

Virtual Volume

Question 11

Refer to the exhibit.

You are preparing to perform an upgrade on an unconfigured VPLEX Metro. When you run the ndu pre-check command, it indicates that it has failed and there are no first upgraders. In your troubleshooting, you run the version -a command.

Based on the output, what is the reason for the failure?

Options:

A.

health-check --full was not run

B.

Directors are at incompatible code levels

C.

ndu pre-check --force flag was not used

D.

Directors are not connected.

Question 12

During an installation, the physical equipment inspection reveals an ESX host used for VPLEX Witness is located in the same rack as VPLEX cluster 1 Engine.

What needs to be done?

Options:

A.

VPLEX Witness server must be in a separate cabinet in the same data center.

B.

The VPLEX Witness server must be placed in a separate failure domain.

C.

Decrease network delay to reduce effects of equipment proximity.

D.

The ESX host must be placed in a separate cabinet due to cooling requirements.

Page: 3 / 8
Total 210 questions