New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

HP HPE0-S59 Actual Questions

Page: 7 / 8
Total 104 questions

HPE Compute Solutions Questions and Answers

Question 25

Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.

What should you do to resolve this issue?

Options:

A.

Disable deduplication for this volume at the array level

B.

Remove the offline disks using array management tools

C.

Install and configure MPIO on me Windows system

D.

Remove the offline disks using Windows Disk Management

Question 26

Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.

Which HPE compute system meets this customer's requirements?

Options:

A.

HPE ProLiant DL380 Gen 10 Plus

B.

HPE Synergy 480 Gen10 Plus

C.

HPE ProLiant DL560 Gen10

D.

HPE Superdome Flex 280

Question 27

A junior architect designed a solution based on HPE Synergy that must meet the following requirements:

    Support at least 30 HPE Synergy 480 Gen10 Plus compute modules

    Interconnect modules must provide MAC and WWN virtualization

    All HPE Synergy frames must formulate a single management entity

    The management appliance should not be a single point of failure

    Connectivity to FC array should be available to all compute nodesThe proposal consists of:

    3 HPE Synergy 12000 frames

    6 HPE Composer 2 modules

    2 HPE Virtual Connect SE 100Gb F32 Module

    4 HPE Synergy 50Gb Interconnect Link ModuleWhich statements about this proposed design are true? (Select two)

Options:

A.

FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Module must be added.

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100Gb F32 modules.

C.

Remove 4 HPE Composer 2 modules from the design, as they are not required.

D.

The selected interconnect modules do not provide the requested WWN virtualization.

E.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules.

Question 28

Refer to Exhibit:

Your customer plans to update the firmware for the logical interconnect shown.

Based on the information in the exhibit, which statement about network connectivity is true?

Options:

A.

Only the manual orchestration method will allow a firmware upgrade without causing network downtime.

B.

It is possible to update this logical interconnect without network downtime if orchestrated method is used.

C.

Compute nodes will experience network downtime if the Force option is selected, as it will enforce parallel update.

D.

Compute nodes will experience network downtime not longer than 1 minute regardless of the orchestration method.

Page: 7 / 8
Total 104 questions