After the connection is completed, what items are generally required to be checked?
After the project delivery, the O&M expenses are continuously generated. Which of the following items are the expenses generated during the O&M? (Multiple Choice)
Which of the following networks are involved during construction of a large enterprise network? (Multiple Choice)
The migration rollback time can be determined based on the actual migration situation without the need to plan in advance.