An administrator has two clusters: Site A and Site B.
Async DR is configured between the clusters as follows:
• Site A is the Primary Site
• Site B is the Secondary inactive Site, no VMs running
• Site A is fully in Production
• Site B used as Backup/Disaster Recovery
The customer wants to perform a planned failover between the sites.
How should the administrator accomplish this?
Over the period of 2 to 3 weeks, a cluster displays the following:
•Periods where Warning Alerts of memory usage over 75% are asserted
•Periods where Critical Warnings of memory usage over 90% are asserted
•Periods of slow of frozen VDI desktops have caused work stoppage or slowdown
•VDI clones have periodically not powered up when called, causing work stoppage
Which steps should be used to prioritize the administrator’s troubleshooting efforts?
A customer has a four-node cluster and is using Volume Groups to provide storage services to a SQL cluster.
In the event of a CVM failure in the cluster, what is the expected IO path of the volume group’s iSCSI targets?
An administrator is implementing a VDI solution. The workload will be a series of persistent desktops in a dedicated storage container within a four-node cluster. Storage optimizations should be set on the dedicated storage container to give optimal performance including during a node failure event.
Which storage optimizations should the administrator set to meet the requirements?