Question 5

The most appropriate production output reporting method for repetitive manufacturing is:

Options:

A.

operation-by-operation.

B.

count point.

C.

job tickets.

D.

backflush.

Question 6

In which of the following environments is capable-to-promise (CTP) more appropriate than available-to-promise (ATP)?

Options:

A.

Consumer electronics sold through local retailers

B.

Industrial supplies shipped from regional distribution centers (DCs)

C.

Packaged foods sold in grocery stores

D.

Specialty chemicals packaged and shipped to order

Question 7

An advantage of activity-based costing (ABC) is:

Options:

A.

it allows raw material costs to be allocated on a per unit basis.

B.

it uses cost drivers to allocate costs to products.

C.

it is easier to establish standard costs.

D.

it enables overhead costs to be allocated evenly across all products.

Question 8

The results from responding to uncertainty in the supply chain by exaggerating lead times and increasing lot sizes is called:

Options:

A.

bullwhip effect.

B.

supply and demand.

C.

process train.

D.

forward integration.