What factors should be considered to determine whether enough testing has been performed?
(i)The exit criteria.
(ii)The budget.
(iii)How big the test team is.
(iv)The product's risk profile.
(v)How good the testing tools are.
(vi)Sufficient details of the system status to allow decisions
A client-server system for a web development must support a minimum of 200 enquiries per hour. In peak times, it must be available 24 hours x 7 days due to the critical nature of the application, and must have a response time lower than 20 seconds during peak loads.
Which of the following set of test types would be most appropriate to verify the non-functional requirements expressed in this statement?
What can testing demonstrate?
Which of the following test design techniques is classified as a structure-based (white box) technique? [K1]