The noise levels in the data center are approximately 91 dB (A).
Do employers need to take precautions?
What should be considered when installing overhead data cabling?
You are allowed to use a calculator for this question.
A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.
The temperature is 20 °C / 68 °F.
The required design concentration is 7%.
The S-Factor is 0.1359 (metric) / 1.885 (imperial).
Calculate the amount of gas required for this computer room based on FM200. What is the correct weight?
From the options indicated, what is the correct starting point for the raised floor installation?