Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

All H35-210_V2.5 Test Inside Huawei Questions

Page: 2 / 11
Total 299 questions

HCIA-Access V2.5 Exam Questions and Answers

Question 5

Regarding the use of ADSL interleaving mode, which of the following statements is correct?

Options:

A.

Increased stability and long delay

B.

Increased stability and short delay

C.

Poor stability and long delay

D.

Poor stability and short delay

Question 6

Which of the following methods can be used for the reset test of the MA5600T/MA5680T single board?

Options:

A.

Hot-swappable the board, check whether the board can be restored to normal after reset

B.

Press the RESET button on the handle bar of the main control board to forcibly reset the main control board. Observe whether the main control board can return to normal after resetting.

C.

Use the command board reset to reset the service board. Check whether the service board can be restored to normal after resetting.

D.

All of the above

Question 7

QA engineers start the SmartKit NSE2700 Quality Inspector tool, which of the following methods can be supported to connect devices?

Options:

A.

Telnet method

B.

SSH way

C.

Multi-hop method

D.

Serial port mode

Question 8

Is the following description correct? The ADSL port can only allow further operations on the port after unblocking the port.

Options:

A.

True

B.

False

Page: 2 / 11
Total 299 questions