A report author needs to produce a JRS report that only shows high priority work items.
How can this be accomplished?
An administrator wants to make sure that time remaining on work items in a plan view are consistent with the estimate.
Which plan check ensures this?
A development has organized the source code into components and found that there is a strong dependency or containment relationship between two of the components.
What action could the development team take to establish this relationship?
An organization plans to have a large number of project areas. The process engineering team plans to Change roles as well as the associated permissions. The organization does not allow changes to a project area process directly on the production system and needs to minimize the work to deploy a new process to all the project areas.
How can this be accomplished?
A project manager asks the administrator to restrict user access to the project area to only people on the project.
Where would the administrator go in order to modify this?
An administrator is designing the representation of the following:
1) which team is responsible for work items
2) in which build the defects were discovered
3) the timeframe for the work item to be completed
Which of the following shows the correct relationships?
Management has requested that two RTC evaluation servers and two RTC departmental servers be deployed. Each RTC server will have a firewall blocking access to jazz.net and requires different installation packages.
What is the correct installation option?
A user loaded a repository workspace that flows with the team's stream. The user can see an incoming change for the file CoreClass in the RTC client, but decides to edit this file and check in the change.
How does the Jazz SCM handle this situation?
A developer has created a repository workspace on the server and wants to be able to access the files locally via installed tools such as editors and compilers.
What action must the developer take to accomplish this?