A deployment professional needs to configure the IBM QRadar systems so that data is forwarded to one or more vendor systems, such as ticketing or alerting systems.
Which event format options can the deployment professional use for forwarding destination configuration?
What are anomaly detection rules used for?
A company has a large network with multiple segments. The manufacturing area network and the research and development (R&D) area network are separated from the product area network, and the customer does not want to run scanners through firewalls. A deployment professional has been tasked with proposing a strategy to ensure vulnerability assessment operations cover all company assets.
In addition to a scanner in the production area network, which option should the deployment professional follow?
A deployment professional is faced with the following system notification.
38750107 - The last attempt to read in rules (usually due to a rule change) has failed. Please see the message details and error log for information on how to resolve this.
What should the deployment professional do after trying to disable and enabling the rule?
A deployment professional decides to improve visibility in the network and successfully installs the Flow Collector.
What should the deployment professional connect the Flow Collector to?
A deployment professional needs to check which rules cause events to be dropped on the Console with Pipeline NATIVE_To_MPC messages.
Which script would help with this task?
The deployment professional needs to pull events from an HR system that are recorded in a database. Which protocol would be used to collect the data?
A deployment professional configures QRadar auto-update with the automatic install option for all update types where automatic install is available.
Assuming all auto-update installations are successful, which update types will need manual installation?
A deployment professional is challenged with incomplete report results. The report is being created but it not displaying all data.
What would be the first thing the deployment professional would do to determine whether or not the report is incomplete?