Free and Premium EMC DES-6322 Dumps Questions Answers

Page: 1 / 4
Total 105 questions

Specialist - Implementation Engineer-VxRail Exam Questions and Answers

Question 1

A VxRail E560F model was delivered six months ago and is now scheduled to be installed with the target code. What is the correct order of steps to complete this task?

Options:

Buy Now
Question 2

What is a characteristic of the VxRail S Series node?

Options:

A.

Form factor of 2U4N

B.

Large form factor drives

C.

Dense Flash disks

D.

Form factor of 1U1N

Question 3

An implementation engineer places a VxRail node into maintenance mode using the Ensure accessibility setting What is the engineer likely planning to do?

Options:

A.

Extensive maintenance

B.

Temporary maintenance

C.

Permanent removal of host from cluster

D.

Shutdown of an entire cluster

Question 4

For which typical activity would the Full data migration setting be used when placing a VxRail host into maintenance mode?

Options:

A.

Temporary maintenance

B.

Rebooting a single ESXi host

C.

Shutting down an entire cluster

D.

Permanently removing host from cluster

Question 5

An implementation engineer is working with a customer to prepare an external vCenter Server for a new VxRail deployment with the VxRail-deployed VDS. What vCenter objects must exist for a successful VxRail deployment?

Options:

A.

Cluster and VxRail Management user only

B.

Datacenter Cluster, and VxRail Management user

C.

Datacenter and Cluster only

D.

Datacenter and VxRail Management user only

Question 6

A systems engineer is deploying a VxRail cluster. They want to ensure that configuration issues can be avoided when expanding this cluster.

Which actions need to be performed?

Options:

A.

Verify VxRail nodes are racked and connected to the ToR switches

Validate the network environment

B.

Validate that no pending and unfinished jobs are running on the servers

Verify that the server and storage components are working properly

C.

Validate that the latest updates and patches are installed in the system

Validate that no pending and unfinished jobs are running on the servers

D.

Verify the configuration settings initially captured in PEQ

Validate the storage environment

Question 7

Which VxRail Series is designed to support a VDI environment and requires a GPU card in each host?

Options:

A.

S Series

B.

V Series

C.

G Series

D.

P Series

Question 8

Which command can be used from the VxRail Manager VM to restart the loudmouth daemon?

Options:

A.

systemctl restart loudmouth

B.

/usr/lib/vmware/loudmouth/bin/loudmouthd restart

C.

/etc/init.d/loudmouth restart

D.

systemctl restart vmware-loudmouth

Question 9

Match each VxRail data protection solution with its functionality.

Options:

Question 10

What Is a supported method for racking nodes for a new VxRail deployment?

Options:

A.

In the rack hosting the network equipment used to manage the iDRAC

B.

With PDUs connected to 120v single phase 5-amp electrical circuits

C.

Starting with node 1 at the top of the rack

D.

With server exhaust facing the cold aisle

Question 11

Which service determines the primary node after powering on the VxRail nodes during the deployment of a VxRail cluster?

Options:

A.

Loudmouth

B.

Election

C.

Marvin

D.

Mystic

Question 12

Where can an administrator find steps to perform a manual verification of the customer network?

Options:

A.

Customer Simplified Form

B.

Dell EMC VxRail Network Planning Guide

C.

Pre-Engagement Questionnaire (PEQ)

D.

Dell Technologies SolVe Online

Question 13

An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?

Options:

A.

5

B.

10

C.

20

D.

25

Question 14

What is a valid 2-node VxRail cluster configuration?

Options:

A.

2x 10 GbE and 2x 25 GbE in a switch configuration and external vCenter

B.

2x 1 GbE and 2x 10 GbE in a direct-connect configuration and external vCenter

C.

2x 1 GbE and 2x 10 GbE in a switch configuration and internal vCenter

D.

2x 10 GbE and 2x 25 GbE in a direct-connect configuration and internal vCenter

Question 15

According to the VxRail PEQ Engagement Details worksheet, links to what resources should the SE send to the customer?

Options:

A.

VxRail vCenter Server Planning Guide

Network Validation Tool

B.

VxRail vCenter Server Planning Guide

VxRail Network Planning Guide

C.

VxRail QuickStart Guide

VxRail Network Planning Guide

D.

VxRail QuickStart Guide

Network Validation Tool