Question 1

An implementation engineer is attempting to add a new node to a 3 node VxRail cluster.

What is the minimum VxRail code version that no longer requires the fourth node to match the first three

nodes?

Options:

A.

4.0.302

B.

4.0.502

C.

4.5.070

D.

4.5.150

Buy Now
Question 2

What is the purpose of the As-Built Configuration Generator?

Options:

A.

Create the customer deliverable documentation of the Dell EMC product/solution implementation

B.

Keep a record of all spare nodes, not yet added to a VxRail Cluster

C.

Provide advanced control grouping for Stretched Clusters

D.

Capture and generate the installation workflow for review in the event of a failed deployment

Question 3

Which log bundles can be included in VxRail automated log collection used for troubleshooting?

Options:

A.

Mystic, Loudmouth and iDRAC

B.

VxRail, ESXi, and vCenter

C.

ESXi, Loudmouth and PTAgent

D.

VxRail, Mystic, and vCenter

Question 4

What is the minimum number of VxRail nodes required for a vSAN storage policy with FTT = 2 an6 FTM set to Erasure Coding?

Options:

A.

4

B.

5

C.

6

D.

7

Question 5

Which settings would be expect to find in the VxRAIL_SYSTEM-STORAGE=PROFILE?

Options:

A.

FTT=2

Object space reservation (%) - 0

B.

FTT = 1

Object space reservation (%) - 100

C.

FTT = 2

Object space reservation (%) - 100

D.

FTT = 1

Object space reservation (%) = 0

Question 6

Which tool is required to re-image a VxRail G560F system?

Options:

A.

POST

B.

RASR

C.

MBS

D.

BOSS

Question 7

A Stretched VxRail cluster is being designed with four nodes per site, for a total of eight nodes. How many sites are required for this configuration?

Options:

A.

2

B.

3

C.

4

D.

8

Question 8

A Dell EMC solutions architect has updated the VxRail PEQ with Customer Top-of-Rack (ToR) switch details.

On which worksheet would they need to be to generate a new NVT JSON file?

Options:

A.

Engagement Details

B.

Networking Details

C.

Customer

D.

VxRail Cluster

Question 9

How many nodes can be added simultaneously to an existing VxRail Cluster?

Options:

A.

1

B.

2

C.

4

D.

6

Question 10

After powering on Dell PowerEdge-based VxRail nodes, what defines the primary node of the cluster being

configured?

Options:

A.

Marvin

B.

PTAgent

C.

Loudmouth

D.

Election Process

Question 11

You are designing a VxRail Stretched Cluster for a company with two datacenters. The primary datacenter will

host all the workloads; the secondary datacenter will be for disaster recovery.

Where should you host the witness virtual appliance?

Options:

A.

Both datacenters

B.

Secondary datacenter only

C.

Primary datacenter only

D.

Cloud

Question 12

In a VxRail Stretched Cluster deployment what is the required Round Trip Time (RTT) between sites?

Options:

A.

Primary to Witness site RTT < 200 ms Secondary to Witness site RTT: < 200 ms Primary to Secondary site RTT; < 5 ms

B.

Primary to Witness site RTT: < 250 ms Secondary to Witness site RTT: < 250 ms Primary to Secondary site RTT: < 10 ms

C.

Primary to Witness site RTT: < 10 ms Secondary to Witness site RTT: < 10 ms Primary to Secondary site RTT < 6 ms

D.

Primary to Witness site RTT: < 150 ms Secondary to Witness site RTT: < 150 ms Primary to Secondary site RTT < 10 ms

Question 13

What is a requirement for Top-of-Rack (ToR) switches when deploying a VxRail cluster?

Options:

A.

Must be manufactured by Dell, Cisco, or Brocade

B.

Must support IPv6 Multicast

C.

Must have two switches in the cluster

D.

Must support 25GbE connectivity

Question 14

What software component is part of the VxRail Operations and Management Stack?

Options:

A.

VMware vCenter

B.

vRealize Automation

C.

Secure Remote Services

D.

vRealize Operations

Question 15

Which command can be used from VxRail Manager VM to restart the loudmouth daemon?

Options:

A.

systemctl restart loudmouth

B.

/etc/init.d/vmware-loudmouth restart

C.

systemctl restart vmware-loudmouth

D.

/etc/init.d/loudmouth restart

Question 16

How many nodes can be added simultaneously to an existing VxRail cluster running at code version 4.5?

Options:

A.

1

B.

3

C.

6

D.

8

Question 17

During a VxRail 2 node Cluster deployment, what Is a valid connects option?

Options:

A.

4 x 1 GbE

B.

2 x 25 GbE

C.

2 x 10 GbE

D.

4 x 25 GbE

Page: 1 / 4