Question 1

Which of the following is a project risk mitigation step you might take as test manager? 1 credit

Options:

A.

Testing for performance problems

B.

Hiring a contractor after a test analyst leaves the company

C.

Arranging a back-up test environment in case the existing one fails during testing

D.

Performing a project retrospective meeting using the test results after each increment

Buy Now
Question 2

Which of the following is least likely to be used as a technique to identify project and product risks? 1 credit

Options:

A.

Brainstorming

B.

Inspections

C.

Expert interviews

D.

Independent assessments

Question 3

Which test management control option is most appropriate to adopt under these circumstances? 2 credits

Options:

A.

Introduce mandatory evening and weekend working to retrieve the 3 week slippage.

B.

Reconsider the exit criteria and review the test plan in the context of the current situation.

C.

Advise the user community regarding the reduced scope of requirements and the additional incremental delivery.

D.

Arrange a meeting with the user community representatives to discuss the user interface.

Question 4

A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.

i. External test specialists perform non-functional testing.

ii. Testing is outsourced.

iii. Testing is carried out by the developer.

iv. A separate test team carries out the testing.

v. Testing is performed by the business.

vi. Testing is performed by a different developer.

Which of the following orders the above in a correct order of independence? 1 credit

Options:

A.

i, ii, iv, vi

B.

ii, i, v, vi

C.

ii, v, i, iii

D.

i, iv, v, vi

Question 5

Based on the information given in the scenario, identify how the team could be improved most effectively? 2 credits

Options:

A.

By providing training in the payroll domain

B.

By providing a workshop on test design techniques

C.

By providing specific training on the systems being tested

D.

By providing training on reviewing requirements

Question 6

Which of the following is a valid drawback of independent testing? 1 credit

Options:

A.

Developer and independent testing will overlap and waste resources.

B.

Developers loose the sense of responsibility and independent testers may become a bottleneck.

C.

Independent testers need extra education and always cost more.

D.

Independent testers will become a bottleneck and introduce problems in incident management.

Question 7

Evaluate the status of the project against the defined exit criteria. Which of the following options shows the correct status? 2 credits

Options:

A.

Criteria A = OK, criteria B = OK, criteria C = OK

B.

Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK

C.

Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK

D.

Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK

Question 8

What is the Risk Priority Number for risk item number 2? 2 credits

Options:

A.

16

B.

2

C.

1

D.

63

Question 9

What would be a test approach regarding the test design techniques to be applied that would fit an item with the highest risk? 2 credits

Options:

A.

Component testing: decision testing; System testing: exploratory testing

B.

Component testing: decision testing; System testing: decision table testing

C.

Component testing: statement testing; System testing: equivalence partitioning

D.

Component testing: statement testing; System testing: decision table partitioning

Question 10

The business has asked for a weekly progress report. Which of the following would be appropriate as a measure of test coverage? 2 credits

Options:

A.

Percentage of business requirements exercised

B.

Percentage of planned hours worked this week

C.

Percentage of countries that have test scenarios

D.

Percentage of test iterations completed

Question 11

As a result of the RAD based development approach, the test manager has decided to change the risk mitigation approach. Which test technique might be most appropriate to use? 2 credits

Options:

A.

Decision Table Testing

B.

Boundary Value Analysis

C.

Error Guessing

D.

Exploratory Testing

Question 12

Why might a RAD approach be a better option for the test manager rather than a sequential development? 2 credits

Options:

A.

It will extend the development team’s abilities and enhance future delivery capabilities.

B.

It will allow the marketing, clerical and testing staff to validate and verify the early screen prototypes.

C.

Time-box constraints will guarantee code releases are delivered on schedule.

D.

More time can be spent on test execution as less formal documentation is required.

Question 13

You are considering involving users during test execution. In general, what is the main reason for involving users during test execution? 1 credit

Options:

A.

They are a cheap resource

B.

They have good testing skills

C.

This can serve as a way to build their confidence in the system

D.

They have the ability to also focus on invalid test cases

Question 14

Which of the following team roles would be most appropriate to enhance the team and why? 2 credits

Options:

A.

A person with the ability to complete tasks

B.

A quality assurance officer

C.

A person with in-depth technical skills

D.

A person who brings new ideas to the team

Question 15

In addition to introducing the new team member, you have decided to raise motivation. Which of the measures listed below would be the best measure to take in order to increase the motivation of the team? 2 credits

Options:

A.

Provide more time for testing in the schedule

B.

Allow people to take some time off

C.

Introduce entry criteria to the testing phase

D.

Organize a meeting with senior management in which they address the importance of good testing for this project

Question 16

Which of the following is an example of testing as part of the requirements specification phase? 1 credit

Options:

A.

A requirements review meeting

B.

A business analyst eliciting requirements

C.

Performing acceptance tests against requirements

D.

A test report showing requirements coverage

Question 17

The introduction of reviews and inspections has often failed as a process improvement action. Identify the THREE most important measures that should be taken to reduce the risk that this test process improvement will fail. 2 Credits (for 2 out of 3 correct 1 credit)

Options:

A.

Process ownership and experienced moderators who drive the inspection process.

B.

Management support

C.

Training of those involved

D.

The availability of stands and processes

E.

Usage of a more traditional software development lifecycle

F.

Alignment with software process improvement

G.

Using a reference model, e.g. TMMi

Question 18

What is the main reason why reviews are especially beneficial in the above-mentioned scenario? 2 credits

Options:

A.

They ensure a common understanding of the product.

B.

They find defects early.

C.

They enhance project communication.

D.

They can be performed without exercising the code.

Question 19

The test improvement project will take place in an organization developing a safety-critical avionics application. Which one of the following standards do you believe would be most appropriate to take into account for compliance during your assignment? 1 credit

Options:

A.

ISO 9126

B.

IEEE 829

C.

BS 7925/2

D.

DO-178B

Question 20

Model characteristics:

Which THREE of the below mentioned characteristics relate to TMMi? 1 credit

Options:

A.

5 maturity levels

B.

Focussed on higher level testing

C.

20 key areas

D.

Highly related to CMMI

E.

Continuous model

F.

Staged model

G.

Focussed on component and integration testing

Question 21

A test assessment has been carried out using the selected model as a reference framework. A number of recommendations have been identified and you are asked to prioritize them. Based on your knowledge of the project, you are expecting severe resistance to change. Which of the following would be the most important selection criterion for defining the priority of the recommendations? 2 credits

Options:

A.

Synchronized with the overall long-term organizational strategy

B.

Defined according to the maturity model used

C.

Most visible to stakeholders

D.

Low costs actions first

Question 22

Which of the following would you expect to see in the master test plan? 1 credit

Options:

A.

A description of how the test cases are cross-referenced to requirements in the test management tool.

B.

A detailed identification of the resources that will carry out structural testing in the first iteration.

C.

The test approach that will be applied at system integration testing.

D.

A list of the names of the testers who will carry out the performance testing for the final iteration.

Question 23

Which of the following are valid reasons for adopting a different life cycle (from the V model), for increments after the first year? 2 credits

i. We do not have a clear understanding of the requirements from a customer perspective.

ii. We see the risk of delivering requested functionality late as being higher than the risk of delivering a lower quality product.

iii. We do not have a budget for additional regression testing which is needed to ensure that existing functionality is not compromised by future iterations.

iv. The company test strategy does not fit well within the V life cycle model.

Options:

A.

(i) and (ii)

B.

(i) and (iv)

C.

(ii) and (iii)

D.

(ii) and (iv)

Question 24

Which of the following is a characteristic of good testing in any life cycle model? 1 credit

Options:

A.

Analysis and design of tests begins as soon as development is completed.

B.

Some, but not all, development activities have corresponding test activities.

C.

Each test level has test objectives specific to that level.

D.

All document reviews involve the development team.

Question 25

Considerable attention will be given in this project to defining exit criteria and on reporting back on their status. Which combination of TWO exit criteria from the list would be best to use? 1 credit

I. Total number of defects found

II. Percentage of test cases executed

III. Total test effort planned versus total actual test effort spent

IV. Defect trend (number of defects found per test run over time

Options:

A.

(i) and (ii)

B.

(i) and (iv)

C.

(ii) and (iii)

D.

(ii) and (iv)

Question 26

Consider the typical objectives of testing. Which of the following metrics can be used to measure the effectiveness of the testing process in achieving one of those objectives? 1 credit

Options:

A.

Average number of days between defect discovery and resolution

B.

Percentage of requirements covered

C.

Lines of code written per developer per day

D.

Percentage of test effort spent on regression testing

Question 27

Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains! 1 credit

Options:

A.

High level of documentation

B.

Failure Mode and Effect Analysis (FMEA) sessions

C.

Traceability to requirements

D.

Non-functional testing

E.

Master test planning

F.

Test design techniques

G.

Reviews

Question 28

What can testing demonstrate?

Options:

A.

Testing can demonstrate that there are no defects

B.

Testing can demonstrate that there are defects

C.

Testing can demonstrate that the software is correct

D.

Testing can demonstrate that there are no hidden defects in the software

Question 29

What is decision table testing?

Options:

A.

It’s a testing design technique based in the internal software structure.

B.

It’s a static test design technique.

C.

It’s a testing design technique to verify decisions.

D.

It’s a testing design technique based in the system requirements.

Question 30

Which of the following factors will MOST affect the testing effort required to test a software product? [K1]

Options:

A.

The number of staff available to execute tests

B.

The level of detail in the test plan

C.

The requirements for reliability and security in the product

D.

The test estimation method used

Question 31

Select THREE issues from the options provided that should at least be raised. 1 credit

Options:

A.

Has there been sufficient comparison of tools?

B.

What are the problems we are trying to address?

C.

Do we have a set of tool requirements to validate the tool against?

D.

How will the implementation be organized?

E.

Which project will be selected to perform the tool pilot?

F.

Is customized training available?

G.

How will the change process be managed?

Question 32

Which of the following would you least expect to form part of the analysis of initial tool costs? 1 credit

Options:

A.

Integration with other tools

B.

Learning time required to use the new tool

C.

Tool portability

D.

Evaluation of suitable tools

Question 33

A system is being enhanced to simplify screen navigation for users.

Which of the following does NOT reflect structural testing?

Options:

A.

To test all paths that users could take through the screen menu system

B.

To ensure that 100% decision testing is achieved for each system component

C.

To test all branches of component calls within the application call graph

D.

To ensure that users can navigate to all fields on the screen

Question 34

You have investigated different possibilities and selected four of them to present to IT management. Which of the proposals will you most likely give your highest recommendations? 3 credits

Options:

A.

Insourcing of test automation based on an offer from a local company ABC that has people who are specialists in system level capture-replay automation tools and they also do regular training courses in test automation methods and tools. They can then work closely with Vicki.

B.

Outsourcing of test automation based on an offer from an Asian company, AsiaAutoTest, which has people who are specialists in system level capture-replay automation tools. They also offer training and besides they offer to run and maintain the regression tests in the future.

C.

Internal offer from the development department of XYZ to create the regression package using CppUnit as test automation tool. One of the development groups have very good experiences in automating unit tests, and they are willing to do training as well.

D.

Solution from a tool vendor offering to educate two test team members in the use of their easy-to-use test automation capture replay tool over the first 3 month and based on that build the regression test suite. In addition to Vicki, Steve is the only one that has time available to be educated.

Question 35

Instead of having an independent test team within the company, the company is considering to outsource testing. What are THREE key challenges that are typical for outsourcing? 1 credit

Options:

A.

Test environment more complex

B.

Define expectation for tasks and deliverables

C.

Clear channels of communications

D.

Possibly different cultures

E.

Testing of non-functional requirements

F.

Audit trail from requirements to test cases

G.

Applying test automation

Question 36

Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits

Options:

A.

Create an estimate based on the function point analysis technique and test point analysis

B.

Create an estimate based on the complexity of the code

C.

Create an estimate based on the credentials of the successful bidder

D.

Create an estimate based on a percentage of the development effort

Question 37

When is testing complete?

Options:

A.

When time and budget are exhausted.

B.

When there is enough information for sponsors to make an informed decision about release.

C.

When there are no remaining high priority defects outstanding.

D.

When every data combination has been exercised successfully.

Question 38

Which is not the fundamental test process?

Options:

A.

Planning and control

B.

Test closure activities

C.

Analysis and design

D.

None

Question 39

Which of the following is correct?

Debugging is:

Options:

A.

Testing/checking whether the software performs correctly.

B.

Checking that a previously reported defect has been corrected.

C.

Identifying the cause of a defect, repairing the code and checking the fix is correct.

D.

Checking that no unintended consequences have occurred as a result of a fix.

Question 40

Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

Based on the chart above, what is the most appropriate next test phase? 1 credit

Options:

A.

Acceptance testing to verify the business process

B.

Acceptance testing to verify operational requirements

C.

Requirements testing as part of testing regulatory compliance

D.

Another system test cycle to verify defect resolution

Question 41

Given the following figures for the testing on a project, and assuming the failure rate for initial tests remains constant and that all retests pass, what number of tests remain to be run? 3 credits

Options:

A.

700

B.

720

C.

784

D.

570

Question 42

Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan? 3 credits

Options:

A.

An approach to regression testing

B.

A list of boundary values for “advance amount”

C.

A description of dependencies between test cases

D.

A logical collection of test cases

Question 43

Which of the following phases in the fundamental test process is considered to deliver a document which can be used as a major input for test process improvement? 1 credit

Options:

A.

Test planning and control

B.

Test implementation & execution

C.

Evaluating exit criteria and reporting

D.

Test project closure

Question 44

During test process improvement it is recommended to use standards where possible. Standards originate from various sources and they cover different subjects in relation to testing Pick TWO sources of software standards, useful to software testing from the ones mentioned below. 1 credit

Options:

A.

ISO 9126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

B.

ISA 4126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

C.

BS-7925-2 ‘Software testing. Software component testing is a national standard used internationally. It covers a number of testing techniques that may be useful both on component testing level and on system testing level.

D.

SY-395-01 ‘Standard for East Coast Hospital software’ is a regional standard adapted from a national one. Besides hospital software, this standard ought to be used also by other types of software system in the region.

E.

IEEE 829 ‘standard for software test documentation’ is an international standard to be following mandatory by all testing origination regardless of lifecycle models.

Question 45

Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits

Options:

A.

No priority or severity assigned

B.

Incident numbering is manual rather than automated

C.

No mentioning of reproduceability

D.

No classification on type of incident

Question 46

Which of the following product risks would be most effectively addressed just by static testing? 3 credits

Options:

A.

In the delivered application, one of the countries, as specified in the requirements, has not been correctly implemented.

B.

The application takes too long to process a request for additional cover.

C.

The test cases do not cover the key requirements.

D.

The successful bidder may not deliver all the required functionality on time.

Question 47

The development manager is managing the review of the responses received from bidders, and has asked the in-house test manager to provide a review checklist for the test management aspects of the responses. Which of the following checkpoints would be appropriate? 2 credits

Options:

A.

The bidder’s test policy should enforce that incident management fully conforms to IEEE 1044.

B.

The bidder’s project strategy shows that the data content of all the test environments conforms to EU standards.

C.

The bidder’s test plan shows that the application will be delivered for acceptance in six months time.

D.

The bidder’s project test plan depicts a phased implementation with later delivery dates to be confirmed and states that test deliverables will be developed using IEEE 829 as a guide.

Question 48

Identify THREE items that would be part of the work-breakdown structure showing the key testing activities for the acceptance test project. 2 credits (for 2 out of 3 correct 1 credit)

Options:

A.

Test planning, test case preparation and test execution for each of the four iterations

B.

Work should be explicitly allocated to test completion, test management, installation and to training on using the system

C.

Activities to deploy the system in the user environment

D.

Regression testing in the second, third and fourth iterations

E.

Development activities for unit and integration testing

F.

Reviews on requirements documentation

G.

Defining test environment requirements for system testing

Question 49

You have been asked to write a testing strategy for the company. Which statement best explains how risk can be addressed within the testing strategy? 1 credit

Options:

A.

A test strategy should address identified generic product risks and present a process for mitigating those risks in line with the testing policy.

B.

A test strategy identifies the specific product for a project risk and defines the approach for the test project.

C.

A test strategy is derived from the test policy and describes the way risk assessments are performed in projects.

D.

A test strategy is the result of a project risk analysis and defines the approach and resources for testing.

Question 50

Part of the testing strategy indicates that you are going to be using systematic test design techniques. Your manager has asked that you present the main advantages of using these techniques at the next board meeting. Identify THREE main benefits of using systematic test design techniques within this company. 2 credits (for 2 out of 3 correct 1 credit)

Options:

A.

Easier to quickly adapt testing to changing requirements compared to experienced-based testing

B.

Targets certain types of faults

C.

Will guide experienced testers to find defects

D.

Provides a way to differentiate depth of testing based on product risks by using different techniques

E.

More enhanced documentation and therefore higher repeatability and reproducibility

F.

Will make non-systematic testing redundant

G.

Will reduce the need for early reviews