Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

USGBC LEED-Green-Associate Exam With Confidence Using Practice Dumps

Exam Code:
LEED-Green-Associate
Exam Name:
LEED Green Associate Exam (LEED GA)
Vendor:
Questions:
303
Last Updated:
Nov 23, 2024
Exam Status:
Stable
USGBC LEED-Green-Associate

LEED-Green-Associate: Leadership in Energy and Environmental Design (LEED) Exam 2024 Study Guide Pdf and Test Engine

Are you worried about passing the USGBC LEED-Green-Associate (LEED Green Associate Exam (LEED GA)) exam? Download the most recent USGBC LEED-Green-Associate braindumps with answers that are 100% real. After downloading the USGBC LEED-Green-Associate exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the USGBC LEED-Green-Associate exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the USGBC LEED-Green-Associate exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (LEED Green Associate Exam (LEED GA)) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA LEED-Green-Associate test is available at CertsTopics. Before purchasing it, you can also see the USGBC LEED-Green-Associate practice exam demo.

Related USGBC Exams

LEED Green Associate Exam (LEED GA) Questions and Answers

Question 1

Which Is a component of a construction waste management plan?

Options:

A.

List of materials to be diverted from disposal

B.

Projected cost savings from diverting waste

C.

Quantity of waste generated from excavated soil

D.

Distance of the recycling facility from the project site

Buy Now
Question 2

During the pre-design phase of a three-story office building, the project team determines that the anticipated energy use of the proposed building will exceed the Owner's Project Requirements (OPR). What strategy should the project team consider in order to lower the building's energy use?

Options:

A.

Increase the square footage of the building

B.

Maximize daylighting opportunities with properly sized and oriented windows

C.

Use valid survey protocols to assess occupants' satisfaction with the indoor environment

D.

Monitor and verity performance to ensure that building systems are functioning as designed

Question 3

Which of the following credit categories is affected by increasing the amount of ventilation in an occupied space?

Options:

A.

Water Efficiency

B.

Indoor Ventilation and Energy

C.

Indoor Environmental Quality

D.

Materials and Resources