Winter Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

SAP C_S43_2023 Exam With Confidence Using Practice Dumps

Exam Code:
C_S43_2023
Exam Name:
SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management
Certification:
Vendor:
Questions:
80
Last Updated:
Nov 21, 2024
Exam Status:
Stable
SAP C_S43_2023

C_S43_2023: SAP Certified Associate Exam 2024 Study Guide Pdf and Test Engine

Are you worried about passing the SAP C_S43_2023 (SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management) exam? Download the most recent SAP C_S43_2023 braindumps with answers that are 100% real. After downloading the SAP C_S43_2023 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the SAP C_S43_2023 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the SAP C_S43_2023 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA C_S43_2023 test is available at CertsTopics. Before purchasing it, you can also see the SAP C_S43_2023 practice exam demo.

SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management Questions and Answers

Question 1

What do you have to consider when planning maintenance work that is to be carried out by an external company?

Options:

A.

If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.

B.

In the control key assigned to the order operation, the "Service" indicator must always be activated.

C.

If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

D.

For the maintenance order type, you have to assign the Enhanced Procurement Mode.

Buy Now
Question 2

Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

Options:

A.

An Inspection Plan and a technical object must be assigned to the same class.

B.

A PM task list with inspection point type must be assigned to the maintenance order

C.

An object list must have been generated manually or automatically.

D.

A checklist type must be assigned to the maintenance order header.

Question 3

How does a performance-based maintenance plan calculate the interval between start date and planned date?

Options:

A.

Cycle length divided by (monthly performance x 12)

B.

Cycle length divided by annual performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance/365)