New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Oracle 1z0-1094-23 Exam With Confidence Using Practice Dumps

Exam Code:
1z0-1094-23
Exam Name:
Oracle Cloud Database 2023 Migration and Integration Professional
Certification:
Vendor:
Questions:
110
Last Updated:
Dec 26, 2024
Exam Status:
Stable
Oracle 1z0-1094-23

1z0-1094-23: Database Cloud Service Exam 2024 Study Guide Pdf and Test Engine

Are you worried about passing the Oracle 1z0-1094-23 (Oracle Cloud Database 2023 Migration and Integration Professional) exam? Download the most recent Oracle 1z0-1094-23 braindumps with answers that are 100% real. After downloading the Oracle 1z0-1094-23 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Oracle 1z0-1094-23 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Oracle 1z0-1094-23 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Oracle Cloud Database 2023 Migration and Integration Professional) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 1z0-1094-23 test is available at CertsTopics. Before purchasing it, you can also see the Oracle 1z0-1094-23 practice exam demo.

Oracle Cloud Database 2023 Migration and Integration Professional Questions and Answers

Question 1

You encounter error ORA-00245 while performing Zero Downtime Migration of an Oracle RAC database. What might be the reason for this?

Options:

A.

The RAC instances are running in Archivelog mode.

B.

Port 1521 is open.

C.

TDE Wallet is configured.

D.

SNAPSHOT CONTROL is not pointing to a shared location on all Oracle RAC instances.

Buy Now
Question 2

Which two prerequisites are required to install Oracle Zero Downtime Migration (ZDM) software? (Choose two.)

Options:

A.

Oracle Grid Infrastructure installed on the ZDM service host

B.

100 GB of free storage space

C.

8 GB of RAM

D.

Installation of the "glibc-devel" and "expect" packages

E.

50 GB of free storage space

Question 3

Which are THREE target database prerequisites for database cloud migration with Oracle Zero Downtime Migration? (Choose all correct answers)

Options:

A.

Transparent Data Encryption (TDE) must be enabled.

B.

The database can be created only after migration has begun.

C.

The database db_name should be the same as the source database.

D.

The TDE wallet status must be open.

E.

The TDE wallet status must be closed.