Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

CCP VCE Exam Download

Page: 3 / 14
Total 189 questions

Certified Cost Professional (CCP) Exam Questions and Answers

Question 9

Deliberate low bidding is often referred to as buying the job. Which of the following would not be a reason for low bidding?

Options:

A.

Survival

B.

Backing out of the bid competition

C.

Reducing cm eliminating competition

D.

Detecting significant errors in the purchaser's request for quote

Question 10

A bond that guarantees the bidder will enter into a contract on the basis of his/her bid is referred to as:

Options:

A.

Surety bond

B.

Performance bond

C.

Bid bond

D.

Liability bond

Question 11

A concrete slab measuring 10 feet wide by 13.5 feet long by 6 inches deep is to be installed. How many cubic yards of concrete will be required?

Options:

A.

3.0 cubic yards

B.

2.0 cubic yards

C.

3.5 cubic yards

D.

2.5 cubic yards

Question 12

Which of the following best describes the concept of total cost management:

Options:

A.

A method of quantifying construction damages where the total job costs are subtracted from the original bid or estimate to determine the total cost amount for a claim

B.

The practices and processes utilized to manage the total life cycle cost investment in a portfolio of strategic assets

C.

A job cost system for ensuring all aspects of a particular manufacturing process are accumulated completely

D.

An integrating process that maps the fields of practice of cost engineering without linking it to project management, resource management, or accounting

Page: 3 / 14
Total 189 questions