You are upgrading firmware on two SN6000 switches in a fabric with a CLI connection. You did not wait for the upgrade to be activated on the first switch before beginning to install the firmware on the second switch.
What must you do to install the firmware on the second switch?
You plan to install an HPE ProLiant DL360 Gen10 in an environment with an ambient temperature of 45 °C (113 °F).
Which additional option is required?
Read the question, and then refer to the exhibit.
A customer added a new switch to their network. They connected it using interface Ten-GigabitEthernet 1/0/1. They are using VLAN 10 and 20 for the devices in their network.
The new switch was fully operational. Then, the customer experienced a power failure later that day and could not reach any device on the new switch after the power returned.
From the output in the exhibit, would could be the issue?