Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

HPE0-V14 Exam Dumps : Building HPE Hybrid IT Solutions (Rev. 19.41)

PDF
HPE0-V14 pdf
 Real Exam Questions and Answer
 Last Update: Apr 3, 2025
 Question and Answers: 303
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
HPE0-V14 exam
PDF + Testing Engine
HPE0-V14 PDF + engine
 Both PDF & Practice Software
 Last Update: Apr 3, 2025
 Question and Answers: 303
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
HPE0-V14 Engine
 Desktop Based Application
 Last Update: Apr 3, 2025
 Question and Answers: 303
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Building HPE Hybrid IT Solutions (Rev. 19.41) Questions and Answers

Question 1

What is the process or writing data to two locations within a single array in real time?

Options:

A.

replication

B.

business continuity

C.

data mirroring

D.

clustering

Buy Now
Question 2

A customer needs a Fibre Channel storage solution that supports block storage with the lowest cost.

Which HPE solution meets this customer’s requirements?

Options:

A.

HPE Nimble Storage

B.

HPE SimpliVity

C.

HPE MSA

D.

HPE StoreVirtual VSA

Question 3

You are installing a server solution in a customer’s data center.

How can you ensure that the installation complies with relevant electrical best practices? (Choose two.)

Options:

A.

Use a single-phase, two-wire power receptacle with protective earth or ground (PE) to filter interference from the power grid

B.

Do not allow the overall system AC current load to exceed 80% of the branch circuit AC current rating

C.

Use fanout cables when connecting the server to the network for maximum electrical impedance

D.

Balance the server power load between available AC supply branch circuits

E.

Configure the server power to a single electrical circuit in the data center