HPE0-V14 Exam Results

Page: 3 / 11
Total 303 questions

Building HPE Hybrid IT Solutions (Rev. 19.41) Questions and Answers

Question 9

A customer needs to implement VMware across a few racks of servers. They anticipate a large amount of VM creation and retirement.

What are key technologies in a Top of Rack (ToR) switch that support this environment? (Choose three.)

Options:

A.

Smart Rate Support

B.

Deep Packet Buffers

C.

VPN Support

D.

PoE support

E.

MLAG support

F.

Rapid Configuration Management

Question 10

You are upgrading firmware on two SN6000 switches in a fabric with a CLI connection. You did not wait for the upgrade to be activated on the first switch before beginning to install the firmware on the second switch.

What must you do to install the firmware on the second switch?

Options:

A.

Perform a hot reset on the first switch to initiate the installation on the second switch

B.

Reactivate the upgrade on the first switch before attempting to update the firmware on the second switch

C.

Reinitialize the devices attached to the first switch before installing the firmware on the second switch

D.

Perform a hot reset on the second switch after the first switch is activated

Question 11

A customer is expanding from local storage to a SAN environment for the firt time. They plan to future proof their environment with a 16 Gb Fibre Channel. They also want to allow for future I/O expansion with new servers.

Identify the correct server and storage to meet the customer requirements.

Options:

Question 12

You are troubleshooting a POST error on a HPE ProLiant rack-mount server. HPE support has directed you to test a minimum hardware configuration.

Which components should you remove? (Choose two.)

Options:

A.

CMOS battery

B.

all cooling fans

C.

all expansion boards

D.

all external storage media

E.

redundant processors

Page: 3 / 11
Total 303 questions