CPIM-ECO Questions Bank

Page: 4 / 4
Total 105 questions

Execution and Control of Operations Questions and Answers

Question 13

Which of the following costing methods shows the greatest apparent profit in a time of inflation?

Options:

A.

Last in, first out

B.

First in, first out

C.

Standard cost

D.

Actual cost

Question 14

Which of the following steps should be first in determining operation start dates for capacity planning?

Options:

A.

Input/output control

B.

Forward or backward scheduling

C.

Finite or infinite loading

D.

Order preparation and release

Question 15

A work center has one machine that is operated for one shift per day. The shop runs an 8-hour shift 5 days per week. Machine utilization has been 60% with efficiency at 80%. A routing through this work center has a standard run time of .10 hours per piece. Job number 1234 is for 200 pieces. If the utilization is improved to 80%, the difference in calculated lead time for the job is how many days?

Options:

A.

1.0

B.

1.3

C.

2.1

D.

2.7