A consultant is onsite with a customer running Foundation VM (FVM) and discovers that there is no connectivity between the FVM and their laptop. The consultant verifies the following:
* The consultant’s laptop and Nutanix nodes are plugged into a flat switch.
* The laptop, switch and nodes are plugged into supported power supplies.
* The laptop network adapters and FVM are configured with their corresponding IP addresses.
What is the cause for the connectivity failure to the FVM?
What reference materials should be provided to the customer during the Knowledge Transfer?
After installation, network ports are properly configured with the default active-backup bonding.
One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should the consultant enable to resolve this issue?