Month End Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

D-PWF-DS-23 Exam Dumps : Dell PowerFlex Design 2023 Exam

PDF
D-PWF-DS-23 pdf
 Real Exam Questions and Answer
 Last Update: Apr 26, 2025
 Question and Answers: 40 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
D-PWF-DS-23 exam
PDF + Testing Engine
D-PWF-DS-23 PDF + engine
 Both PDF & Practice Software
 Last Update: Apr 26, 2025
 Question and Answers: 40
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
D-PWF-DS-23 Engine
 Desktop Based Application
 Last Update: Apr 26, 2025
 Question and Answers: 40
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Dell PowerFlex Design 2023 Exam Questions and Answers

Question 1

An administrator wants to migrate a volume from one storage pool to another storage pool What two volume migrations are possible ?(Select 2)

Options:

A.

Prom MG storage pool volume, non-zero padded and Ihick provisioned lo FG storage pool volume zero padded: and thin provisioned

B.

From MG storage pool volume, zero padded, and thick provisioned to FG storage pool volume, zero padded, and thin provisioned

C.

From FG storage pool volume, zero padded, and thin provisioned to MG storage pool volume, non-zero padded and thick provisioned

D.

From MG storage pool volume, non-zero padded, and thin provisioned to MG storage pool volume, zero padded, and thin provisioned

Buy Now
Question 2

An administrator is adding an NVMe device to an existing storage pool They provide the following details in the Add Storage Device to SDS dialog box

• Device Path /dev/disk/by-id'Dell_Express_Flash_NVMe_PM1725_V6TB_SFF_ _S2JPNA0J500141

• Device Name NVMe A. 1.6 TB

• Storage Pool SP-1

What is the result of this action'?

Options:

A.

The device addition fails due to an invalid path

B.

The device is named "NVMeAt 6 TB" and added to the Storage Pool "SP-1".

C.

The device name is truncated to "NVMe" and added lo the Storage Pool "SP-t"

D.

The device addition tails due to invalid characters in the name

Question 3

A user is attempting to write tiles to a Power Flex File share The share was created with default settings and contains approximately 15 000 files Ten days ago the number of files exceeded the soft limit quota but is still below the hard limit quota What happens if the user attempts to write a new file to the share location?

Options:

A.

The file is not written as the maximum number of allowed files has been reached

B.

The file is not written as the grace period has been exceeded.

C.

The file is written as the hard limit has not been reached.