VMware Related Exams
2V0-31.23 Exam
An administrator is tasked with creating a new vSphere and NSX VMware Aria Automation template for the App-Dev team. The administrator successfully configures multiple network profiles that will create different types of on-demand networks. The App-Dev team wants the VMware Aria Automation template to create an on-demand network that can be connected externally.
Which two network types should the administrator consider using in the VMware Aria Automation template? (Choose two.)
An administrator has been tasked with configuring a new image mapping for Linux deployments within VMware Aria Automation to meet the following requirements:
The number of Virtual Machine templates must be minimized.
Additional configuration (local users and groups) must always be applied irrespective of the cloud template used.
Which four steps should the administrator take to meet the requirement? (Choose four.)
An administrator configures a lease policy with the following settings:
Maximum lease (days): 10
Maximum total lease (days): 30
Grace period (days): 5
If a user does not respond to any emails, after how many days will the deployment be destroyed?