Winter Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Free Access Nutanix NCP-MCI-6.5 New Release

Page: 13 / 13
Total 178 questions

Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI) v6.5 exam Questions and Answers

Question 49

Which two capabilities does IPAM provide in a Nutanix networking configuration? (Choose two.)

Options:

A.

Allows proxy server settings to be set up for a defined network

B.

Allows AHV to assign IP addresses automatically to VMs using DHCP

C.

Configures a VLAN with an IP subnet and assigns a group of IP addresses

D.

Configures firewall rules to prevent or allow certain TCP/IP traffic

Question 50

An administrator needs to configure a new subnet on an AHV cluster and want to ensure that VMs will automatically be assigned an IP address at creation time.

Which type of network does the administrator need to create?

Options:

A.

Dynamic Network

B.

Unmanaged Network

C.

Managed Network

D.

DHCP Network

Question 51

An administrator responsible for a VDl environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of the host CPU on the cluster. The administrator increases the vCPU count on all of the VDl VMs.

What are two impacts on the cluster? (Choose two)

Options:

A.

Increasing CPU counts will decrease memory utilization

B.

Increase memory utilization%

C.

Increase CPU utilization%

D.

Increase CPU ready%

Question 52

Refer to the exhibit.

An administrator is adding a new node to a cluster. The node has been imaged to the same versions of AHV and AOS that the cluster running, configured with appropriate IP addresses, and br0-up has been configured the same the existing uplink bonds

When attempting to add the node to the cluster with the Expand Cluster function in Prism , the cluster is unable to find the new node.

Based on the above output from the new node, what is most likely the cause of this issue?

Options:

A.

The ports on the upstream switch are not configured for LACP.

B.

The existing and the expansion node are on different VLANs.

C.

There is a firewall blocking the discovery traffic from the tlu

D.

LACP configuration must be completed after cluster expansion

Page: 13 / 13
Total 178 questions