Winter Sale - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Free and Premium Microsoft MB-335 Dumps Questions Answers

Page: 1 / 12
Total 209 questions

Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Questions and Answers

Question 1

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Buy Now
Question 2

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Question 3

You need to configure the bicycles’ production resource.

Which option should you use?

Options:

A.

Exclusive capacity set to yes and enter a Batch capacity.

B.

Exclusive capacity set to no and infinite capacity.

C.

Exclusive capacity set to yes and infinite capacity.

D.

Exclusive capacity set to no and enter a Batch capacity.

Question 4

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Options:

Question 5

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Route card journal

B.

Standard production order update

C.

Handheld warehouse device

D.

Job card journal

E.

Report as finished journal

Question 6

You need to create the production orders for standard model bicycles.

Which method should you use?

Options:

A.

Sales order line

B.

Master planning execution

C.

Supply schedule form

D.

Released item

E.

All production orders form

Question 7

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Options:

Question 8

You need to configure the manufacturing groups for the standard model bicycle and the new limited-edition bicycle for the summer season.

Which object should you use?

Options:

A.

Commerce channels

B.

Operating units

C.

Teams

D.

Legal entities

E.

Departments

Question 9

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.

Use a purchase agreement as a service agreement.

C.

Allocate subcontracted work in its own cost breakdown block.

D.

Configure a costing resource and requirement to point to a Vendor type resource.

E.

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Question 10

You need to calculate estimated consumption of ingredients for liquid cleaning solution.

What is the consumption? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 11

You need to configure costing for raw materials used to manufacture unscented cleaning solution.

Which form should you use?

Options:

A.

Cost basis type

B.

Quantity and margin template

C.

Pricing calculation

D.

Pricing template

Question 12

You need to implement the scheduled Kanban requirements.

Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 13

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 14

You need to configure lot number control for inventory. Which option should you use?

Options:

A.

Physical inventory

B.

Blank receipt allowed

C.

Blank issue allowed

D.

Primary socking

Question 15

You need to configure the system to meet the order requirements for unscented cleaning solution. Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Configure the ingredient as a restricted and regulated product.

B.

On the inventory management parameters, set the value for the Print Product Safety Data Sheet and Prevent Sales Pack Slip/Invoke Posting to TRUE

C.

Add the ingredients for unscented cleaning solution to a regulated products inclusion list

D.

Ensure that the PSDS file is active and within the expiration date requirements.

E.

In Document Handling, associate the PSDS file with the PSDS record and set restriction field set to Internal

Question 16

STION NO: 2 HOTSPOT

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 17

A company uses Dynamics 365 Supply Chain Management for its accounts receivable and accounts payable operations.

The company must issue payments to customers based on the sales quantities invoiced over a specific period. A record must be labeled as Pending review when it is generated before anything else is done to the record.

You need to configure the system to apply this labeling functionality to records.

Solution: Create a workflow status. Assign the first step as a review step with the second steps being to approve and post the status.

Does the solution meet the goal?

Options:

A.

Yes

B.

No

Question 18

A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You create the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.

You need to set up a new item model group for the service item.

Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Question 19

A company uses Dynamics 365 Supply Chain Management for its accounts receivable and accounts payable operations.

The company must issue payments to customers based on the sales quantities invoiced over a specific period. A record must be labeled as Pending review when it is generated before anything else is done to the record.

You need to configure the system to apply this labeling functionality to records.

Solution: Configure a business event for the rebate creation.

Create a power automate flow for approvals to lock the record until it is approved.

Does the solution meet the goal?

Options:

A.

Yes

B.

No

Question 20

A candy manufacturer uses Dynamics 365 Supply Chain Management.

A master planning run needs to prioritize the production jobs for fruit snacks by flavor and color every 16 days.

You need to configure the appropriate parameters in the coverage group.

What should you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 21

A company produces rubber hose. Discrete orders accounts for raw material scrap. The scrap is reported through inventory movement journals.

The company has noticed that most of the scrap that is recorded is due to start up that feeds the hose to the finishing process. In addition, the amount of scrap that is recorded is consistent regardless of the amount of hose being produced.

You need to account for material lost during startup.

What should you do?

Options:

A.

Enter the amount of scrap that is consumed as constant scrap in the Bill of materials

B.

Do a case study for the scrap items and enter The average amount of scrap as a separate line items on the Sill of materials.

C.

Enter the consumption amount on the line to match the actual amount used.

D.

Enter the amount of scrap that is consumed as variable scrap in the Bill of materials.

Question 22

You are the production supervisor at a chemical processing plant.

You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.

You need to ensure that the values of attributes are updated and tracked.

What three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Create a test instrument for each attribute.

B.

Create attribute types.

C.

Assign the attributes to the chemicals.

D.

Assign the attributes to the appropriate test on the test group.

E.

Set up batch attributes.

Question 23

A company makes lubricants and greases that are used in the automotive industry.

The items use the standard cost method. Electricity and heating of the manufacturing building are allocated into the cost of goods based on the size and wattage of the machine used.

You need to ensure that the system is set up to support the cost allocation.

How should you complete the costing sheet configuration? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 24

A company uses Dynamics 365 Supply Chain Management for its accounts receivable and accounts payable operations.

The company must issue payments to customers based on the sales quantities invoiced over a specific period. A record must be labeled as Pending review when it is generated before anything else is done to the record.

You need to configure the system to apply this labeling functionality to records.

Solution: Create a rebate status of approved. Enable the Rebates at invoicing and configure the rebate accrual journal in the Accounts Receivable parameters.

Does the solution meet the goal?

Options:

A.

Yes

B.

No

Question 25

You need to configure the production requirements for the QA team. What should you configure?

Options:

A.

product readiness policies

B.

quality order

C.

quarantine order

D.

inventory status

Question 26

You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 27

You need to configure the two lift kit subassembly cost requirements for production.

Which methods should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 28

You need to configure the solution for the two issues the production manager reported.

How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 29

You need to resolve the ModelA charging issue.

Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Ignore scheduled execution

B.

Asset

C.

Tool

D.

Worker

E.

Ignore schedule

Question 30

You need to resolve the issue reported by Buyer1.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Assign new engineering version for parent BOM.

B.

Enable active for planning for lifecycle status.

C.

Assign lifecycle state for parent BOM.

D.

Disable active for planning for lifecycle status.

E.

Assign lifecycle state for subassembly.

Question 31

You need to configure the production requirements of the controller.

What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 32

You need to resolve the ModelT issue reported by the golf course manager.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Service subscription

B.

Counter-based maintenance plan lines

C.

Maintenance plan lines for the location

D.

Service type item

E.

Time-based maintenance plan lines

Question 33

You need to meet the requirements for User2.

What should you configure?

Options:

A.

Process over/under transactions.

B.

Create a transfer journal.

C.

Cancel the product receipt.

D.

Correct the product receipt.

E.

Create a movement journal.

Question 34

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

Options:

A.

Engineering attributes

B.

Change management for process manufacturing

C.

Engineering product variants

D.

Engineering change management

E.

Production floor execution management

Question 35

You must ensure that the firepit product is available for sale. How should the product be released?

Options:

A.

Release the engineering product version and then assign the route.

B.

Connect the BOM to an engineering product version before release.

C.

Connect a route to an engineering version before release.

D.

Release the engineering product version and then assign BOM.

Question 36

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 37

You need to meet the substitution requirements for User4 and User5.

What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 38

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 39

You need to address the ignition switch issue.

Which three actions should you perform? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set product readiness to manual,

B.

Copy link and products.

C.

Define business impact.

D.

Change product lifecycle state.

E.

Set product readiness to automatic.

Question 40

You need to resolve the issue for UserE.

Which configuration options should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 41

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

Options:

A.

Implies[Trim==Legend,Seat==ML]

B.

Seat!=ML

C.

[Trim==Legend|Seat==ML]

D.

Implies[Seat==ML,Trim==Legend]

Question 42

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Question 43

You need to set up the correct production solution for the assembly area. Which solution should you implement?

Options:

A.

Standard warehousing with Manufacturing execution

B.

Standard warehousing for all transactions

C.

Advanced warehousing for all transactions

D.

Advanced warehousing with Manufacturing execution

Question 44

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set the operation route type as Standard.

B.

Set the input warehouse on the resource to the vendor warehouse.

C.

Set the operation route type as Vendor.

D.

Set all BOM lines warehouse to the production warehouse.

E.

Set all the BOM lines to resource consumption.

Question 45

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

unmachined plastic pieces

B.

mold tooling

C.

machined plastic pieces

D.

excess plastic

Question 46

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 47

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 48

You need to set up the configuration model to price the motorcycles correctly. What should you do?

Options:

A.

Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

B.

Set Order type in price model to Sales Order and Pricing method in Version to Cost based.

C.

Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.

D.

Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based

Page: 1 / 12
Total 209 questions